August 16, 2017

Power Stations Performance

POWER STATIONS DAILY GENERATION STATISTICS

1. On August 10 2017, average power sent out was 3,428 MWh/hour (up by 4 MWh/h)

2. The reported gas constraint was 385MW

3. The reported line constraint was 0MW. The reported frequency management constraint due to loss of DisCo feeders was 1347MW

4. The water management constraint was 0MW.

5. The power sector lost an estimated N831,000,000 on August 10 2017 due to constraints.

Source: NCC Daily Operational Report

Sector Reform/ Activities

1. Increasing high frequency constraints leading to reduced generation

2. Reported gas constraints at  Omotosho II, Geregu II, Alaoji II reducing generation at these plants

 

 

 

Power Station Turbines
09 July
Type Energy Sent

Out (MWh)

On 09 Aug

Energy Sent

Out (MWh)

On

10 Aug

  Change
KANJI 4  HYDRO 263 292   29
JEBBA 4  HYDRO 334 353   19
SHIRORO 4  HYDRO 399 478   79
EGBIN 2  STEAM 323 298   -25
SAPELE 1 1 STEAM 53 54   -34
DELTA (TRANSCORP) 10  GAS 393 394   1
AFAM IV – V 0  GAS   0
GEREGU 1 2  GAS 173 176   3
OMOTOSHO 1 3  GAS 55 53   -2
OLORUNSOGUN I 2  GAS 32 36   4
GEREGU NIPP 2  GAS 72 115   43
SAPELE NIPP 1  GAS 91 88   -2
ALAOJI NIPP 1  GAS 58 58   0
OLORUNSOGO NIPP 1  GAS   0
OMOTOSHO NIPP 1  GAS 74 77   3
ODUKPANI NIPP 1  GAS 50 61   11
IHOVBOR NIPP 1  GAS 82 79   -3
OKPAI 3  GAS 183 184   1
AFAM VI 1  GAS 122 123   1
IBOM 1  GAS 44 58   14
A.E.S. 0  GAS   0
ASCO 0  GAS   0
OMOKU 3  GAS 77 76   -1
TRANS AMADI 1  GAS 18 19   1
RIVERS IPP 0  GAS   0
EGBIN ST6 1 STEAM  95 130   35
PARAS ENERGY    GAS 61 69   8
GBARAIN NIPP 1  GAS   0
TOTAL  48   3, 424 3, 428   4