POWER STATIONS DAILY GENERATION STATISTICS

1. On June 19 2017, average power sent out was 3,361MWh/hour (down by 82MWh/h)

2. The reported gas constraint was 1642MW

3. The reported line constraint was 147.5MW. The reported high frequency constraint was 1013MW

4. The water management constraint was 0MW.

5. The power sector lost an estimated N1,345,000,000 on June 19 2017 due to constraints.

Source: NCC Daily Operational Report

Sector Reform/ Activities

1. Afam VI GT12, 13 & ST10 – Out due to condensate along the gas pipeline.

 

 

Power Station Turbines
28thMAy
Type Energy Sent

Out (MWh)

On 18 June

Energy Sent

Out (MWh)

On

19 June

  Change
KANJI 4  HYDRO 161 156   -5
JEBBA 4  HYDRO 162 158   -3
SHIRORO 0  HYDRO 142 127   -15
EGBIN 2  GAS 323 257   -66
SAPELE 1 2  GAS 51 35   34
DELTA (TRANSCORP) 11  GAS 349 389   40
AFAM IV – V 0  GAS   0
GEREGU 1 2  GAS 251 239   -12
OMOTOSHO 1 4  GAS 164 157   -8
OLORUNSOGUN I 6  GAS 163 149   -12
GEREGU NIPP 2  GAS 140 128   -12
SAPELE NIPP 1  GAS 107 107   0
ALAOJI NIPP 1  GAS 89 111   22
OLORUNSOGO NIPP 1  GAS 108 120   12
OMOTOSHO NIPP 1  GAS 178 128   -50
ODUKPANI NIPP 2  GAS 108   -108
IHOVBOR NIPP 1  GAS 182 108   -74
OKPAI 3  GAS 307 284   10
AFAM VI 1  GAS 126 80   -7
IBOM 1  GAS 83 70   -13
A.E.S. 0  GAS   0
ASCO 0  GAS   0
OMOKU 3  GAS 80 74   -6
TRANS AMADI 0  GAS   0
RIVERS IPP 0  GAS   0
EGBIN ST6 1  GAS  206 172   -34
PARAS ENERGY    GAS 67 65   -3
GBARAIN NIPP 1  GAS   0
TOTAL⇑  47   3, 443 3, 361   -82